Preloader

Residential A/C Replacement – Treasure Coast, FL

Project details

Service

Central A/C Installation & Replacement

Project Type

A/C Changeout

Location

Treasure Coast

Equipment

1.5-Ton Split System

Need Help With Your HVAC System?

Project Overview
Indoor Air Care completed a residential central A/C changeout on Florida’s Treasure Coast, replacing the existing system with a new 1.5-ton split system. The installation included the outdoor condenser and indoor air handler, a duct-board transition to the existing ductwork, hurricane-rated equipment support and tie-downs, refrigerant-line protection, overflow protection, and drain-line service access.

Central A/C Replacement for Reliable Home Comfort

The new split system was installed as a matched indoor and outdoor combination, with careful attention to airflow, drainage, refrigerant connections, equipment support, and final system setup.

Years of experience
0 +

Serving the Treasure Coast since 2007, Indoor Air Care brings nearly two decades of hands-on HVAC experience to residential A/C installations and replacements.

Google Rating
0

Our 4.9-star Google rating reflects customer feedback on professional service, clear communication, and quality workmanship.

Final Inspection Passed
0 %

Every installation is completed with careful workmanship, proper system setup, and attention to applicable code requirements and manufacturer’s specifications.

What You Can Expect From Indoor Air Care

From the initial evaluation through final startup, we focus on careful workmanship, clear communication, and a professional service experience from start to finish.

Careful Planning & Installation

Clear, Professional Service

Installation Highlights

Complete Central A/C Changeout

Existing equipment was replaced with a new 1.5-ton split system, including the outdoor condenser and indoor air handler.

Installation Built for Florida Conditions

The installation included a 150 MPH hurricane-rated equipment pad, engineered tie-downs, and protection for exposed refrigerant lines.

Drainage, Ductwork & Final Inspection

The project included a new duct-board transition to the existing ductwork, overflow protection, and drain-line service access. The required residential final inspection passed.

Project Gallery